Skip to content
Criée

Summary: the auction algorithm

The six-step calculation, the Euronext rules and those of the 2008 BVMAC draft, and what the current regulation sets.

Reference4 min

By the end of this lesson

  • Recall in order the rules for choosing an auction price
  • Compare the Euronext rules with those of the 2008 BVMAC draft
In this lesson3

Calculating by hand

  1. List the candidate prices: the limits present.
  2. Cumulative demand D(p): buy orders limited at p or more, plus market buy orders.
  3. Cumulative supply S(p): sell orders limited at p or less, plus market sell orders.
  4. Tradable quantity V(p) = min(D(p), S(p)); surplus E(p) = D(p) − S(p).
  5. Apply the selection rules below, in order.
  6. Fill at the single price: first market orders and orders more aggressive than the price, then, at a limit equal to the price, by time priority.

With the notation of steps 2 to 4:

V(p)=min⁡(D(p), S(p))E(p)=D(p)−S(p)V(p) = \min\big(D(p),\, S(p)\big) \qquad E(p) = D(p) - S(p)

Rules for choosing the price

RankEuronext (reference)BVMAC draft 2008
1Maximise V(p)Maximise the volume traded
2Smallest surplus |E(p)|Minimise the unexecuted balance
3Closest to the reference priceSide of the surplus
4·Closest to the reference price

Sources: Euronext Trading Manual, 2021, sections 3.1.1 to 3.1.4; BVMAC draft instruction No. 2 of 2008, section 2.1.2. At Euronext, if only market orders can be executed against each other, they trade at the reference price.

The curves from exercise 1
9,90010,00010,10010,200Cumulative demandCumulative supply

Equilibrium price 10,100 · 90 shares traded

Chosen because it maximises the quantity traded.

Switch an order on or off: the equilibrium price is recomputed.

What the current BVMAC regulation sets

The auction algorithm the BVMAC applies today is not confirmed: only the 2008 draft describes it. The current tick size, the written price limits and the time zone of the published timetable are not confirmed either. The portal's engine applies the four-rule order of the 2008 draft.

Two prices give the same maximum quantity and the same absolute surplus, with the same sign. Which rule decides according to Euronext, and according to the 2008 BVMAC draft?

Your turn

First rule for choosing the price, at Euronext as in 2008?

1First rule for choosing the price, at Euronext as in 2008?

Which rule appears in the 2008 draft but not at Euronext?

2Which rule appears in the 2008 draft but not at Euronext?

The reference price on the BVMAC is...

3The reference price on the BVMAC is...

Read next: Euronext Trading Manual (5 juillet 2021)

A question? Ask your teacher, or an AI assistant, giving it the title of this lesson.

Share:WhatsAppLinkedIn