Teacher sheet
Financial mathematics
- Who it is for
- Undergraduate finance, economics or business students, vocational banking students; a final-year pupil comfortable with powers can follow lessons 1 to 5, the later ones need square roots and averages.
- Prerequisites
- Compound interest: the lesson in the Investing section (/en/investir/).
- A bond’s coupon and face value: the First steps course (/en/lycee/) or “Bonds: coupon, accrued interest, yield” in the student course.
- A scientific calculator (powers, square roots).
Sessions
Session 1 · Discounting and deciding60 min
- A sum that travels through time
- Compound a sum from today over several years with compound interest
- Discount a future sum and predict the effect of a higher rate
- Bring each sum to the same date before adding them up
- NPV and IRR: is a project worth it?
- Calculate a project’s net present value from its cash flows
- Define the IRR and apply its decision rule against the cost of capital
- Explain why NPV decides between projects of different sizes
- 5 min · Opening question, no calculation: is 1,000,000 FCFA received in three years worth more or less today, at 5% a year?
- 20 min · Reading of “A sum that travels through time”: compounding, discounting, the effect of a higher rate, bringing each sum to the same date; quiz
- 20 min · Reading of “NPV and IRR”: the NPV calculator, decision rules, the workshop’s NPV when the required rate goes from 8% to 9%; quiz
- 10 min · Exercise by hand: NPV of a fictional three-cash-flow project, then checked in the lesson’s calculator
- 5 min · Wrap-up: everyone writes the two formulas of lesson 1 and which one discounts
Session 2 · Bonds: price, yield, sensitivity60 min
- Bond price and yield to maturity
- Calculate a bond’s price by discounting its coupons and its repayment
- Work out whether a bond trades at par, at a premium or at a discount
- Explain why a bond’s price and yield move in opposite directions
- Duration and interest-rate sensitivity
- Explain duration as the average date of a bond’s cash flows
- Estimate the change in price from modified duration and the rate
- Explain why modified duration slightly overstates a large fall in price
- 5 min · Recall: the decision rule with NPV, then with IRR
- 20 min · Reading of “Bond price and yield to maturity”: price of a 3-year 4% bond, at par, premium or discount; a 5% bond trades at 104.20, is its yield higher or lower? Quiz
- 20 min · Reading of “Duration and interest-rate sensitivity”: the tilting-bond animation, sensitivity of 4 and a half-point fall, why the estimate overstates a large fall; quiz
- 10 min · Pair exercise: price of a fictional bond at two rates, then comparison with the sensitivity estimate
- 5 min · Wrap-up: everyone writes why price and yield move in opposite directions
Session 3 · The yield curve and volatility60 min
- Reading the yield curve
- Calculate the slope of a yield curve in basis points
- Recognise an inverted curve and explain the term premium
- Discount each cash flow of a bond at the rate for its maturity
- Return and volatility
- Calculate the average return of a series of annual returns
- Go from variance to standard deviation and justify squaring the deviations
- Compare the risk of two investments by how widely their returns spread
- 5 min · Day’s review at /en/revision/: everyone answers the questions that are due, then the ones several people missed are corrected aloud
- 20 min · Reading of “Reading the yield curve”: 2-year rate of 5.10% and 10-year rate of 4.60%, slope in basis points, inverted curve and term premium; quiz
- 20 min · Reading of “Return and volatility”: the volatility calculator, the five steps of a standard deviation, why deviations are squared; quiz
- 10 min · Exercise by hand: standard deviation of five fictional annual returns, then checking
- 5 min · Wrap-up: everyone writes the five steps of the standard deviation in order
Session 4 · Beta and the efficient frontier60 min
- Correlation and beta
- Calculate a beta from the covariance and the index’s variance
- Interpret a beta and a correlation against the index’s movements
- Calculate an expected return with the CAPM
- Markowitz’s efficient frontier
- Calculate the expected return of a mix of two assets
- Explain how correlation reduces the risk of a mix
- Recognise a dominated portfolio and an efficient portfolio
- 5 min · Recall: a share has a correlation of 0.9 with the index and a beta of 0.5; what does it do when the index rises 10%?
- 20 min · Reading of “Correlation and beta”: the animated scatter plot, beta from the covariance and the index variance, expected return with CAPM; quiz
- 20 min · Reading of “Markowitz’s efficient frontier”: expected return of a mix, the effect of correlation in the animation, a dominated portfolio; quiz
- 10 min · Pair exercise: return and variance of a fifty-fifty mix for a correlation of +1, then of 0
- 5 min · Wrap-up: everyone writes which term in a mix’s variance depends on the correlation
Session 5 · Value at risk, formula sheet and assessment75 min
- Value at risk
- Calculate a normal value at risk from daily volatility
- Interpret a 99% VaR and scale it with the square root of time
- Explain what expected shortfall adds to the VaR
- Sheet: the section’s formulas
- Retrieve the section’s formulas, from discounting to value at risk
- Compare the risk measures: standard deviation, beta, efficient frontier and value at risk
- 5 min · Recall: write from memory the formulas for beta and for correlation
- 20 min · Reading of “Value at risk”: the histogram, a one-day 99% VaR of 500,000 FCFA, expected breaches over 250 days, the square-root-of-time rule, expected shortfall; quiz
- 25 min · The “section’s formulas” sheet: flashcards in pairs, then the sheet’s quiz on the idea shared by discounting and the one shared by risk measures
- 20 min · Assessment at /en/maths/evaluation/, alone and without notes: 15 questions drawn from the quizzes, 11 correct answers for the certificate, to print or photograph
- 5 min · Wrap-up: everyone notes the formula to review before the exam
Tips
- The site is a static export with no server: a page only reopens offline if the browser has already loaded it, and nothing guarantees it. Have the lessons for the session opened the day before, while connected, or project them from a computer that has already displayed them.
- Quiz answers feed the spaced review at /en/revision/: a question comes back the next day, then after 3, 7, 16 and 35 days. Open each session with the day’s review. Progress stays in each phone’s browser: a shared phone mixes results, and private browsing wipes them.
- Print the sheet “Sheet: the section’s formulas” for those without a phone, and have the lesson calculations redone on paper before looking at the answer. The assessment at /en/maths/evaluation/ draws 15 questions from the quizzes; 11 correct answers (70%) give a printable A4 landscape certificate, which is not a diploma.
- Each lesson works the calculation step by step, then redoes it in an interactive calculator: always have it worked by hand first, the calculator is for checking.
- Tricky point: value at risk (lesson 9) is a threshold exceeded one day in a hundred, not a maximum loss; stress the expected shortfall beyond it.
Quiz answer keys
41 questions, with the right answer and its explanation.
A sum that travels through time
Discounting a future sum means...
→ dividing it by (1 + r)^n
You bring the sum back to today by dividing by (1 + r) once for each year of waiting.
500,000 FCFA invested for 2 years at 10% a year, compound interest, become...
→ 605,000 FCFA
500,000 × 1.1 × 1.1 = 605,000. The 600,000 figure is simple interest.
When the discount rate rises, the present value of a future sum...
→ falls, because you divide more
The divisor (1 + r)^n grows with r: the sum brought back to today decreases.
To add 100,000 FCFA in one year and 100,000 FCFA in two years, you...
→ discount each, then add them
Each sum is brought back to today with its own number of years; only then do you add.
NPV and IRR: is a project worth it?
A project costs 1,000,000 FCFA and returns 1,100,000 FCFA in one year. At 10%, its NPV is...
→ exactly zero FCFA
1,100,000 ÷ 1.1 = 1,000,000, minus the cost: 0. Its IRR is therefore exactly 10%.
A project's IRR is the rate at which...
→ NPV equals exactly zero
By definition, at the IRR the present value of inflows equals that of outflows.
IRR of 15%, cost of capital of 11%. The IRR rule advises you to...
→ accept the project
The project earns more than the money financing it costs.
Two mutually exclusive projects: A, IRR 30% on 100,000 FCFA; B, IRR 12% on 50,000,000 FCFA. To choose, you compare...
→ their NPVs, in francs
The IRR ignores size; NPV measures the value created in francs.
Bond price and yield to maturity
A bond with a 7% coupon is valued at a 7% yield to maturity. It trades...
→ exactly at par value
When the coupon equals the required yield, the price equals face value: 100%.
On the BVMAC, a bond quoted at 98.50 costs, for 10,000 FCFA of face value and excluding accrued interest...
→ 9,850 FCFA
The quote is a percentage of face value: 98.50% of 10,000 = 9,850 FCFA.
The yield required by the market rises. The price of a fixed-rate bond already issued...
→ falls, moving the other way
Its cash flows are fixed: discounted at a higher rate, they are worth less today.
A bond trades at 92.00 with a 5% coupon. Its yield to maturity is...
→ higher than 5%
It trades below par: the buyer earns the coupon plus the gap up to 100, so more than 5%.
For 100 of face value, a one-year bond with a 6% coupon, valued at an 8% yield, is worth about...
→ 98.15
A single cash flow, 106 (last coupon plus repayment), discounted over one year: 106 ÷ 1.08 ≈ 98.15. The coupon is below the yield: a discount.
Duration and interest-rate sensitivity
A zero-coupon bond repaid in 5 years has a duration of...
→ exactly five years
A single cash flow, at 5 years: the average of the dates is that very date.
Modified duration of 7, rates up one point. The price changes by about...
→ − 7%
Change ≈ − modified duration × change in rate = − 7 × 1 = − 7%.
For the same maturity, the bond most sensitive to rates is the one whose coupon is...
→ the lowest one
A low coupon shifts the weight of the cash flows towards the final repayment: duration lengthens.
For a large rise in rates, the modified-duration estimate gives a price fall that is...
→ slightly too large
The price-rate link is convex: the true fall is slightly smaller than the linear estimate.
Reading the yield curve
2-year rate 3.20%, 10-year rate 4.45%. The slope is...
→ + 125 basis points
4.45 − 3.20 = 1.25 percentage points, i.e. 125 basis points.
A yield curve is called inverted when...
→ long rates are lower
Inversion: long-term yield below short-term yield, a negative slope.
Usually the curve rises with maturity because investors demand...
→ a premium to lend longer
That is the term premium described by the Banque de France.
With an upward curve, a bond's cash flow received in 3 years is discounted...
→ at the 3-year rate
Each cash flow is discounted at the rate for its own maturity.
Return and volatility
Returns over three years: + 2%, + 4%, + 9%. The average return is...
→ 5%
(2 + 4 + 9) ÷ 3 = 15 ÷ 3 = 5%.
Two investments have the same average return. The riskier one, according to this lesson, is the one whose...
→ standard deviation is largest
For the same average, more widely spread returns mean more risk.
A variance of returns is 64. The standard deviation is...
→ 8%
The standard deviation is the square root of the variance: √64 = 8.
Why do you square the deviations from the average?
→ So the signs cannot cancel
Without squaring, the sum of the deviations is always zero.
Correlation and beta
Covariance with the index 6, variance of the index 4. Beta is...
→ 1.50
Beta = covariance ÷ variance of the index = 6 ÷ 4 = 1.5.
Beta of 2, the index rises 3%. The share rises, on average, by about...
→ 6%
About beta × change in the index = 2 × 3 = 6%.
A correlation close to zero with the index means the share...
→ moves with no link whatsoever
Zero correlation: no linear link between the two series.
Risk-free rate 4%, market 10%, beta 1.5. The CAPM gives an expected return of...
→ 13%
4 + 1.5 × (10 − 4) = 4 + 9 = 13%.
Markowitz’s efficient frontier
30% in A (return 5%) and 70% in B (return 10%). The mix's expected return is...
→ 8.5%
0.3 × 5 + 0.7 × 10 = 1.5 + 7 = 8.5%.
A mix's risk is lowest when the correlation between the two assets is...
→ minus one
At − 1, the covariance term is most negative; with the right weights, risk can fall to zero.
A portfolio is dominated when another mix offers...
→ more return for equal risk
An efficient portfolio has no rival that earns more at equal risk.
According to the 1990 Nobel press release, the risk of an asset that matters for Markowitz is...
→ its contribution to total risk
What counts is the asset's contribution to the risk of the whole portfolio.
Value at risk
Portfolio of 5,000,000 FCFA, daily volatility 2%. Its one-day 95% normal VaR is about...
→ 164,500 FCFA
1.645 × 2% × 5,000,000 = 1.645 × 100,000 = 164,500 FCFA.
A one-day 99% VaR of 300,000 FCFA means that...
→ one day in a hundred exceeds
The 300,000 FCFA threshold is exceeded in 1% of cases on average: it is not a maximum loss.
A one-day VaR is 100,000 FCFA. With the square-root-of-time rule, over 4 days it is...
→ 200,000 FCFA
100,000 × √4 = 100,000 × 2 = 200,000 FCFA.
The current Basel framework supplements VaR with a measure that looks at...
→ the average loss beyond it
Expected shortfall, at 97.5%, measures the size of extreme losses.
Sheet: the section’s formulas
1,210,000 FCFA received in 2 years, at a 10% rate, are worth today...
→ 1,000,000 FCFA
1,210,000 ÷ 1.1² = 1,210,000 ÷ 1.21 = 1,000,000 FCFA.
A bond with a modified duration of 5 sees rates fall by 0.4 point. Its price changes by about...
→ + 2%
Change ≈ − 5 × (− 0.4) = + 2%: rates down, price up.
With a correlation of + 1, mixing two assets reduces risk...
→ not at all
At ρ = 1, the mix's risk is the simple average of the risks: no diversification gain.
A portfolio's 99% VaR is exceeded, on average...
→ once in a hundred days
The 99% level leaves 1% of days beyond the threshold.